Thread: F7 Cost of Investment

  1. #1
    jacq is offline New Member (0-29 posts) jacq is on a distinguished road
    Join Date
    Dec 2008
    Location
    Scotland
    Posts
    2
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default F7 Cost of Investment

    Hi all

    I'm looking for some help with the discount fraction for deferred consideration. I know that the interest rate is 10% and the payment is deferred for 3 yrs - how do I calculate the fair value? Thanks

  2. #2
    Suze is offline Senior Member (100-499 posts) Suze is on a distinguished road
    Join Date
    Apr 2008
    Location
    Guyana
    Posts
    207
    Thanks
    1
    Thanked 0 Times in 0 Posts

    Default

    multiply the consideration by 1/1.1 to the 3rd power to bring it to the present value

  3. #3
    mode21 is offline New Member (0-29 posts) mode21 is on a distinguished road
    Join Date
    Sep 2008
    Location
    trinidad
    Posts
    1
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default

    you have to use 1 / (1+10)3 that should be the power 3, that should give you .751, just multiple this answer by the consideration and you will get the present value of the consideration
    Last edited by mode21; 14-05-09 at 05:37 PM.

+ Reply to Thread

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

     

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts